Manufacturing Process of Transformer

Cream Section Separator

Introduction Process

Makpower Transformer are manufactured with national and international standards.

Arrow
Red Section Separator

Intitial Process:

Design and Selection of Raw Material

Arrow

Winding Process

Copper or aluminum wires are carefully insulated and wound around the core to create primary and secondary coils.

White Line
Arrow
Red Section Separator

Core Construction Process : 

The laminated core is assembled to reduce energy losses and ensure efficient magnetic flux flow.

Arrow

Core & Coil Assembly :

Core Coil Assembly for better Short Circuit withstanding ability during fault conditions.

Arrow

Tank Fabrication

Tank is fabricated using High grade tested mild steel plates, welded together to create a sturdy enclosure.

Arrow
Red Section Separator

All fabricated steel tanks are cleaned and painted with glossy, oil & weather resisting, not fading paint to prevent corrosion.

Painting/Finishing:

Arrow

Transformer Oil:

Transformer oil is filled inside the tank to provide cooling and insulation. Generally Makpower  use ‘TRANSOL’ make EHV grade Oil.

Arrow

Testing & Shipping

Transformers are delivered to customers by Makpower after successfully passing a rigorous final inspection and testing process.

White Line
Arrow

Contact Us:

For more detailed manufacturing process of transformer from Makpower Transformer visit our website.

Address - 7/2A Gopal Ram Pathak Road, Liluah - 711204 Contact No -  +91 9830917200

Cream Section Separator