Latest updates, technical whitepapers, maintenance guides, and industrial transformer engineering insights from Makpower.
The furnace supplier has confirmed the machine dimensions, but the electrical team is still waiting for its load details. Meanwhile, the factory drawing alre...
Two production lines may run comfortably on their own, yet the plant starts having electrical trouble when both operate together. Operators adjust the schedu...
A new machine may have a confirmed delivery date while the electrical arrangements are still being worked out. The foundation is ready, the floor space has b...
Some industrial loads behave very differently from the rest of the equipment in a plant. A large motor may draw heavy current while starting, while a furnace...
A large factory rarely relies on one transformer to handle every electrical job. Power may enter the site at one voltage, move through the plant at another, ...
The transformer repair bill is usually the first cost anyone sees after a unit goes offline. The bigger expense may already be building elsewhere in the plan...
A large motor starts on one side of the plant, and a control circuit somewhere else drops out a moment later. The two pieces of equipment may serve completel...